Georgian Railway Infrastructure Development Feasibility Study and Preliminary Design

The project was financed by JSC Georgian Railway and EBRD.
Spectrum acted as a consortium member led by Systra.

The main components of the assignment were:
Elaboration of Feasibility Study for rehabilitating, developing, and modernising the
Georgian Railway main line.

 

Feasibility covered:
Engineering and technical assessment of the railway main line.
Preparation of ESIA.
Performance of geological desk study.
Preparation of CBA.
Prepare initial engineering design and tender documents under FIDIC Yellow Book
contract terms and conditions.