Performance of the very first Household Survey for the City of Tbilisi.
Identification of the most intensive passenger traffic corridors.
Elaboration of the tramway master plan for Tbilisi.
Selection of the most appropriate corridor for the first tramway line.
Performance of the preliminary design.