The Project consisted of the following components:
Elaboration of the Technical Feasibility Study.
Elaboration of EIA.
Elaboration of the Resettlement report.
Elaboration of the Land Value Study
Elaboration of the Market Study.
Elaboration of CBA.
Institutional study.
Elaboration of the territory Master Plan.
Preliminary design of the territory, including new roads and transport links.